The voussoir placed at crown of an arch, is known as a

A) Key

B) Soffit

C) Springer

D) Haunch

Check Answer

A) Key


The art of bringing the floor to a true level surface by means of screeds, is called

A) Topping

B) Bedding

C) Screeding

D) None of these

Check Answer

C) Screeding


The window which projects outside a room of a building for admitting more light and air, is known

A) Bay window

B) Casement window

C) Lantern window

D) Dormer window

Check Answer

A) Bay window


Minimum width of landing should be

A) Equal to width of stairs

B) Half the width of stairs

C) Twice the width of stairs

D) One fourth the width of stairs

Check Answer

A) Equal to width of stairs


The inner section of a cavity wall, is generally known as

A) Buttress

B) Leaf wall

C) Pilaster

D) Pillar

Check Answer

B) Leaf wall


The window which is provided on a sloping roof of a building, is called

A) Louvered window

B) Dormer window

C) Rash window

D) Lantern window

Check Answer

B) Dormer window


While designing a stair, the product of rise and going is approximately kept equal to

A) 450

B) 420

C) 500

D) 350

Check Answer

B) 420


The number of steps in a flight generally should not be less than

A) 5

B) 3

C) 2

D) No limit

Check Answer

B) 3


The ceiling height of a building is

A) Upto ceiling from the ground level

B) Upto roof above ground level

C) Between ceiling and floor level

D) Between ceiling and ground level

Check Answer

C) Between ceiling and floor level


Pile foundations are suitable for

A) Multi-storeyed buildings

B) Compact soils

C) Soft rocks

D) Water logged soils

Check Answer

D) Water logged soils