Bridge Engineering (GPSC Civil PYQs) Online Test 1 (Free)

Report a question

You cannot submit an empty report. Please add some details.
0 votes, 0 avg
2

Bridge Engineering (GPSC Civil PYQs) Online Test 1 (Free)

-: Symbols & Description :-

(નિશાનીઓ અને તેનું વર્ણન)

 

-: Instructions :-

(સૂચનાઓ)

 

1. Click On Full Screen Mode (¤) From Corner For Best Test Experience

(બેસ્ટ ટેસ્ટ અનુભવ માટે ખૂણામાં આપેલ ફૂલ સ્ક્રીન મોડ (¤) ઉપર ક્લિક કરો)

2. Use Navigation Bar For Jumping Forward or Backward To Any Question

(કોઈ પણ પ્રશ્ન ઉપર જવા માટે નેવિગેશન બારનો ઉપયોગ કરવો)

3. Submit Test Button Will Be Only Visible At The Last Question

(ટેસ્ટ સબમિટ કરવાનો ઓપ્શન માત્ર છેલ્લા પ્રશ્ન ઉપર હશે)

4. Don't Forget To Give Your Rating & Review At The End Of Test

(ટેસ્ટ પૂરી થયા પછી રેટિંગ & રિવ્યુ આપવાનું ભુલશો નહીં)

 

"BEST OF LUCK"

[Click On Full Screen Mode (¤) From Corner For Best Test Experience]

(બેસ્ટ ટેસ્ટ અનુભવ માટે ખૂણામાં આપેલ ફૂલ સ્ક્રીન મોડ (¤) ઉપર ક્લિક કરો)

---------------

Your Name

1 / 10

Category: Bridge Engineering (GPSC Civil PYQs)

For bridging gaps in hilly areas _______ bridges are ideal solution.

2 / 10

Category: Bridge Engineering (GPSC Civil PYQs)

The advantages of providing bearings in a bridge is/are

(i) To absorb movement of girder

(ii) To spread the load from the superstructure in such a manner that the bearing stress induced on the material is within the permissible limits.

(iii) To take up vertical movement due to sinking of supports

3 / 10

Category: Bridge Engineering (GPSC Civil PYQs)

Extradosed bridges combine the characteristics of

4 / 10

Category: Bridge Engineering (GPSC Civil PYQs)

Which of the following are the ideal bridge site characteristics?

i. The stream at the bridge site should be well defined and as broad as possible

ii. There should be no confluence of large tributaries

iii. The flow of water in the stream should be in steady regime conditions

5 / 10

Category: Bridge Engineering (GPSC Civil PYQs)

The tracked vehicle loading specified under IRC Class AA originated due to the loading pattern of __________

6 / 10

Category: Bridge Engineering (GPSC Civil PYQs)

___________ are the end supports to superstructure of bridge which retain earths on their back side which serves as an approach to the bridge.

7 / 10

Category: Bridge Engineering (GPSC Civil PYQs)

In erection of bridges the Incremental launching method is used when the bridge decks are greater than

8 / 10

Category: Bridge Engineering (GPSC Civil PYQs)

Depending on the transmission of loads to joints, bridges are classified as

9 / 10

Category: Bridge Engineering (GPSC Civil PYQs)

The span of the bridge is said to be economical when

10 / 10

Category: Bridge Engineering (GPSC Civil PYQs)

For bridges of National Highways, the class of loading considered as per IRC is

Your score is

The average score is 33%

0%

"Rate This Test"

"Thank You"

Leaderboard
Pos.NameScoreDuration
1Hetal70 %2 minutes 50 seconds
2ROHITKUMAR AYAR30 %44 seconds
3Guest0 %0 second
Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments