The platform at the end of a series of steps, is known as

A) platform

B) relief

C) rest

D) landing

Check Answer

D) landing


The arrangement of supporting an existing structure by providing supports underneath, is known as

A) shoring

B) underpinning

C) jacking

D) piling

Check Answer

B) underpinning


The dimensions of a half queen closer, are

A) 9 cm x 9 cm x 9 cm

B) 9 cm x 9 cm x 4.5 cm

C) 9 cm x 4.5 cm x 9 cm

D) 1.8 cm x 4.5 cm x 9 cm

Check Answer

C) 9 cm x 4.5 cm x 9 cm


The maximum bearing capacity of soil is that of

A) black cotton soil

B) loose fine sandy soil

C) dry coarse sandy soil

D) hard rocks

Check Answer

D) hard rocks


Exposed portions of vertical surface at right angles to the door or window frame, are known as

A) jambs

B) lintels

C) reveals

D) soffits

Check Answer

C) reveals


For brick construction, the lime-sand mortar, is

A) 1:1

B) 1:2

C) 1:3

D) 1:4

Check Answer

B) 1:2


A floor constructed with 3 mm marble chips, is known

A) mosaic floor

B) terrazo floor

C) chips floor

D) marble floor

Check Answer

B) terrazo floor


The 19 cm x 9 cm side of a brick as seen in the wall face, is generally known as

A) stretcher

B) face

C) front

D) header

Check Answer

A) stretcher


Raft foundation are generally preferred to when the area required for individual footing, is more than

A) 25% to total area

B) 30% of total area

C) 40% to total area

D) 50% of total area

Check Answer

D) 50% of total area


The process of keeping concrete moist for a certain period after its finishing, is known as

A) finishing of concrete

B) curing of concrete

C) placing of concrete

D) compaction of concrete

Check Answer

B) curing of concrete