GPSC Civil Engineering Practice Paper (Date : 12/06/2023)

50 MCQs - 50 Marks (All Subject)

1 / 50

_____ is a projecting stone which is provided to serve as support for a roof truss, a beam or a weather shed.

2 / 50

Pick the incorrect pair :

3 / 50

The quantity of sludge with 95% moisture will be _____ that of 90% moisture for same volume of solids

4 / 50

In CPM and PERT methods activities are connected with each other in _____ .

5 / 50

The edges formed by the intersection of plane surfaces of brick are called

6 / 50

Keeping the instrument height as 1.5 m, height of staff 4 m, the slope of the ground as 1 in 10, the sight distance on the down-slope must be less than

7 / 50

For determining the ultimate bearing capacity of soil, the recommended size of a square bearing plate to be used in load plate test should be 30 to 75 cm square with a minimum thickness of

8 / 50

In Vicat’s apparatus, the cross-sectional area of needle used is _____ , and time to penetrate _____ is used to measure initial setting time of cement.

9 / 50

To determine stability of earth dam slopes immediately after construction the pore pressures are generally estimated using

10 / 50

Benching in a manhole is the

11 / 50

The model and prototype are dynamically similar if both the systems have

12 / 50

Storey drift in any storey shall not exceed ______ times the storey height under the effect of design base shear applied as per IS 1893, 2016.

13 / 50

Which of the following order of action is suggested?

14 / 50

Moment area method is best suitable for finding

15 / 50

From civil engineering view point, if a dam is to be placed on a geological fold, which one of the following situations will be the worst?

16 / 50

Precedence Network Analysis (PNA) method of network analysis better addresses the real life situation in a construction project than CPM because

17 / 50

Which of the following is not a reagent needed for estimating Oil and Grease present in wastewater?

18 / 50

Bishop’s method of stability analysis

19 / 50

Grit chambers are provided

20 / 50

The Mercator projection system used in atlases uses a

21 / 50

A plan drawn to a scale of 1:4000 was measured by a scale of 1:5000. The %error in the length measured will be:

22 / 50

Spectral resolution means:

23 / 50

The main disadvantage of concrete blocks used for masonry as compared to bricks is

24 / 50

In plastic analysis of structures, the segment between any two successive plastic hinges is assumed to deform as _____.

25 / 50

Which one of the following statements regarding the cement fineness is NOT correct?

26 / 50

White cement is white in colour due to

27 / 50

What is the value of Maximum effective slenderness ratio (KL/r) for a compression flange of beam against lateral torsional buckling?

28 / 50

A typical sequence of following development phases in a construction project is
(P) Plan development,
(Q) Commissioning
(R) Concept analysis
(S) Execution

29 / 50

The factor of safety against sliding should be more than _____ .

30 / 50

Fossils can occur only in

31 / 50

A narrow strip of wood which is nailed over the joints of boards is known as

32 / 50

The most common countermeasure used to prevent scour at bridge abutments is

33 / 50

Following statements are made on compacted soils, wherein DS stands for the soils compacted on dry side of optimum moisture content and WS stands for the soils compacted on wet side of optimum moisture content. Identify the incorrect statement.

34 / 50

When sustained downward seepage forces are acting on the soil and later when seepage stops, soil will become

35 / 50

What is the Buckling class for hollow cold formed Sections as per IS:800, 2007?

36 / 50

Importance factor (I) for residential or commercial buildings with occupancy more than 200 persons as per IS:1893 (2016) is

37 / 50

Extradosed bridges combine the characteristics of

38 / 50

In active state of plastic equilibrium in a non cohesive soil with horizontal ground surface

39 / 50

In a civil engineering work contract, the purpose of appointing an arbitrator is to

40 / 50

Analysing and preparation of comparative statement of contractor is done at which step of tendering process?

41 / 50

The size of group – I type coarse graded aggregate is

42 / 50

The main undesirable properties of concrete are:
i) Undergoes shrinkage
ii) Requires careful attention during manufacturing, placing, and curing
iii) Has lower tensile strength
iv) For equal load, cement members are heavier than steel members

43 / 50

In impulse turbine the total energy at inlet is

44 / 50

In geological features, the folds bending upwards are known as

45 / 50

_______ is a groove provided on the underside of a coping so that the rain water can be discharged clear of the wall surface

46 / 50

In moment area method the slope of real beam at a section is represented by

47 / 50

The function(s) of cleats in a roof truss is/are
i. to prevent the purlins from tilting
ii. to connect purlins with the common rafter
iii. to support the common rafter

48 / 50

The extended aeration process has

49 / 50

The design bending strength of laterally unsupported beam is governed by _____ .

50 / 50

Complimentary shear stresses are the shear stresses acting on a set of planes which are

Your score is

0%


Surveying PYQs, GPSC Civil Engineering
Fundamental Concepts of Surveying PYQs
Chain & Tape Survey PYQs
Compass Survey & Traversing PYQs
Levelling PYQs
Contouring PYQs
Theodolite Survey PYQs
Tacheometric & Trigonometric Survey PYQs
Plane Table Survey PYQs
Curves PYQs
Area & Volume Measurement PYQs
Aerial Photogrammetry & Field Astronomy PYQs
Remote Sensing, GIS, GPS & Modern Instruments PYQs

Click Here To View All GPSC Civil Engineering Previous Year Asked Questions
Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments