The solvent used in cut back bitumen is

A) Diesel

B) Petrol

C) Oil

D) Kerosene

Check Answer

D) Kerosene


The removal and diversion of surface water from the roadway is called

A) Cross slope

B) Camber

C) Sub surface drainage

D) Surface drainage

Check Answer

D) Surface drainage


Driving vehicles on wet surfaced roads, is dangerous because it may

A) Overturn

B) Slip

C) Skid

D) All the above

Check Answer

B) Slip


The traffic manoeuvre means

A) Crossing

B) Merging

C) Diverging

D) All the above

Check Answer

D) All the above


IRC recommends total reaction time for SSD Calculation is

A) 1.8 second

B) 2.3 second

C) 2.5 second

D) 2 second

Check Answer

C) 2.5 second


The distance travelled by a moving vehicle during perception and brake reaction time is

A) Lag distance

B) Stopping distance

C) Sight distance

D) None of these

Check Answer

A) Lag distance


The ideal form of curve for summit curve is

A) Spiral

B) Circular

C) Parabolic

D) Lemniscate

Check Answer

C) Parabolic


The width of formation of a road means the width of

A) embankment at ground level

B) Pavement and Shoulder

C) Carriage way

D) all the above

Check Answer

B) Pavement and Shoulder


Transition curve is introduced in

A) Vertical curve

B) Between horizontal curve and circular curve

C) Circular curve

D) Horizontal curve

Check Answer

B) Between horizontal curve and circular curve


The stopping sight distance does not depend on

A) Friction

B) Length of vehicle

C) Speed of vehicle

D) Break reaction time

Check Answer

B) Length of vehicle